Sprint Week Plan (10/31/2016)

General Summary: ARE YOU READY TO RUMBLE.

Goal Description Breakdown Lead
Video Documentation Two minute video documenting process throughout the week
  • Filming (Jenn + Fish)
  • Editing (Jenn)
Jenn
Summary Schedule Schedule detailing the next 18 weeks of the project
  • Compiling (Fish)
Fish
Sunnyside Logo Official logo of Sunnyside Studios. Team logo as well as used as in game letterhead.
  • Concepts (Fish)
  • Render (Jenn
Jenn
Interface Prototype Interactable interface prototype with basic functionality implemented.
  • Move between screens
  • Trigger dialogue
  • Player choices
Fish
Character Sprites Character design and art for the NPC.
  • Concepts (Jenn)
  • Sprites (Jenn)
Jenn
Puzzle Design Three puzzles designed and finalized.
  • Design (Jenn + Fish)
Jenn

SCHEDULE
Monday Sprint Plan due 12AM
Fish Logo Concepts
Jenn Design Puzzles
Both Discuss which logo to move forward with
Tuesday
Fish Begin Prototype
Jenn Logo Render, Character Concepts
Both Discuss which character concept to move forward with
Wednesday Design Meeting at 9.5AM | Advisement Meeting at 12.5PM
Fish Continue Prototype
Jenn Character Sprites, Design Puzzles
Both Discuss Puzzles
Thursday Elective at 12PM
Fish Continue Prototype
Jenn Design Puzzles
Both Discuss Puzzles
Friday Video + Summary Schedule due 8PM
Fish Summary Schedule
Jenn Edit/Compile Video
Both IMPORTANT: Order a pizza or something
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s